Professional Trustworthy
在样式表里 对header进行样式改写 类名是top-fixed 写法: .header.top-fixed

Tube

Railing ordering guide


1. Specify the material and surface treatment method of the railing as needed.


2. According to the need and refer to the following figure, select the specifications of the railing and the form of the column.


3. If necessary, indicate whether the railing has a ribs. If so, please indicate the installation method of the ribs.


4. If there are other special requirements, please consult our company's business personnel directly and indicate on the contract.


Railings are usually denominated in meters (without mounting bolts).

wow.js
top